SOTIROPOULOS TECHNIKI P.C. has successfully executed projects at HELLENIC PETROLEUM S.A. & MOTOR OIL (HELLAS) S.A. refineries.
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Piping works at the unit U-2750 of Aspropyrgos Industrial Complex during SHUT DOWN in September 2018 |
Amount |
: |
32.200 € |
Year |
: |
2018 |
Client |
EVAGGELOS SAKANTANIS & Co L.P. |
Project |
: |
Piping works for the VRU INTERCONECTING at HEL.PE./Aspropyrgos Industrial Complex |
|
Amount |
: |
43.800 € |
|
Year |
: |
2018 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Tubes replacement works at the floor of K-1001-C boiler & BUTTERFLY valves replecement at U-5140 of Aspropyrgos Industrial Complex |
Amount |
: |
90.730 € |
Year |
: |
2018 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Several works at K-1001-C boiler of Aspropyrgos Industrial Complex |
Amount |
: |
118.700 € |
Year |
: |
2018 |
Client |
EVAGGELOS SAKANTANIS & Co L.P. |
Project |
: |
Piping works for the material upgrate of U-200 piping to SS 316l of MOTOR OIL (HELLAS) CORINTH REFINERIES S.A. |
|
Amount |
: |
13.550 € |
|
Year |
: |
2018 |
Client |
ANELIXIS CONSTRUCTIONS P.C. |
Project |
: |
T-792 tank connection works with the circuit of T-782 tank for MOTOR OIL (HELLAS) CORINTH REFINERIES S.A. |
|
Amount |
: |
17.645 € |
|
Year |
: |
2018 |
Client |
ANELIXIS CONSTRUCTIONS P.C. |
Project |
: |
Prefabrication & erection of coil at T-709 tank for MOTOR OIL (HELLAS) CORINTH REFINERIES S.A. |
|
Amount |
: |
39.000 € |
|
Year |
: |
2018 |
Client |
ANTHIS GEORGIOS & Co L.P. |
Project |
: |
Soaker alteration into supply vessel & BOOSTER pump installation at U-200 for MOTOR OIL (HELLAS) CORINTH REFINERIES S.A. |
|
Amount |
: |
63.400 € |
|
Year |
: |
2018 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Piping works in several Units of Aspropyrgos Industrial Complex during SHUT DOWN 2017 |
Amount |
: |
139.400€ |
Year |
: |
2017 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Upgrading works of the fire protection system at the new jetty & LPG jetty at Aspropyrgos Industrial Complex |
Amount |
: |
454.000 € |
Year |
: |
2016-2017 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Mechanical works for the relocation of two (2) Loading Arms from Eleusis Industrial Complex to Aspropyrgos Industrial Complex |
Amount |
: |
185.600 € |
Year |
: |
2016 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Pipeline replacement at the old jetty of Aspropyrgos Industrial Complex |
Amount |
: |
20.000 € |
Year |
: |
2015 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Tube replacement works from main steam collectors to steam drum of K-1001-D at Aspropyrgos Industrial Complex |
Amount |
: |
38.000 € |
Year |
: |
2015 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Piping works and coil replacement at the L-3702 A/B incinerator during SHUT DOWN at Aspropyrgos Industrial Complex |
Amount |
: |
540.000 € |
Year |
: |
2015 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Replacement works of the 10″-O-921502-BD5 (P5, P9) the U-9200 unit at Aspropyrgos Industrial Complex |
Amount |
: |
82.000 € |
Year |
: |
2015 |
On the other hand, Sotiropoulos Nikolaos participated in a technical company with the same purpose, as Shareholder & Board Member. Alongside he was Project Director, with main role the organization, supervision & execution of projects for clients as HELLENIC PETROLEUM S.A., MOTOR OIL HELLAS S.A. & others.
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Installation works of new HHGO at U-2100 of Aspropyrgos Industrial Complex |
Amount |
: |
527.000 € |
Year |
: |
2012 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Fabrication & replacement of Ρ-5401 tank at U-5400 (FLARE 87) of Aspropyrgos Industrial Complex |
Amount |
: |
23.000 € |
Year |
: |
2012 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Modification of pipe lines of P-8702A tank for SR KERO use & of P-8758C tank for heating diesel oil use at Aspropyrgos Industrial Complex |
Amount |
: |
250.000 € |
Year |
: |
2011-2012 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Various piping works at refinement units during Shut Down 2011 at Aspropyrgos Industrial Complex |
Amount |
: |
180.000€ |
Year |
: |
2011 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Installation of new DBB valves at the unit 3900 of Aspropyrgos Industrial Complex |
Amount |
: |
450.000€ |
Year |
: |
2011 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Replacement of 32” & 42” cooling water manifolds & 6”, 12”, 14” underground transport oil pipelines at Aspropyrgos Industrial Complex |
Amount |
: |
110.000€ |
Year |
: |
2011 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Modification of existing air-cooling system of Μ-2205 A/B/C/D at U-2100 of Aspropyrgos Industrial Complex |
Amount |
: |
120.000€ |
Year |
: |
2011 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Interconnection of pipelines to HELLENIC FUELS S.A. jetty with Aspropyrgos Industrial Complex pipelines |
Amount |
: |
250.000€ |
Year |
: |
2011 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Streamers’ replacement inside the PIT Ρ-3701Β at Aspropyrgos Industrial Complex |
Amount |
: |
151.000 € |
Year |
: |
2010 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Various piping works & replacement of safety valves during Shut Down September 2009 at Aspropyrgos Industrial Complex |
Amount |
: |
700.000 € |
Year |
: |
2009 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Heat exchangers maintenance during Shut Down September 2009 at Aspropyrgos Industrial Complex |
Amount |
: |
500.000 € |
Year |
: |
2009 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Erection of new compressor & interconnection with FCC unit at Aspropyrgos Industrial Complex |
Amount |
: |
350.000 € |
Year |
: |
2009 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Fabrication & erection of new 10” firefighting pipeline |
Amount |
: |
180.000 € |
Year |
: |
2006 |
Client |
HELLENIC PETROLEUM S.A. |
Project |
: |
Repairing works of fuel oil pipelines from Aspropyrgos Industrial Complex to Eleusis & Megara Industrial Complex |
Amount |
: |
780.000 € |
Year |
: |
2005-2006 |
- MOTOR OIL HELLAS CORINTH REFINERIES S.A.
Client |
MOTOR OIL HELLAS CORINTH REFINERIES S.A. |
Project |
: |
Turn around works at U-4950/7300/7700 & condensate pipeline replacement at U-7700 due to leakage |
|
Amount |
: |
260.000 € |
|
Year |
: |
2013 |
|
Client |
MOTOR OIL HELLAS CORINTH REFINERIES S.A. |
Project |
: |
Safety valves conversion of FCC at unit 3700 |
|
Amount |
: |
345.000 € |
|
Year |
: |
2013 |
|
Client |
MOTOR OIL HELLAS CORINTH REFINERIES S.A. |
Project |
: |
Various mechanical works during Shut Down 2011 |
|
Amount |
: |
250.000 € |
|
Year |
: |
2010-2011 |
|
Client |
MOTOR OIL HELLAS CORINTH REFINERIES S.A. |
Project |
: |
Mechanical works for the revamping of lubricant units U-300,400,500 |
|
Amount |
: |
1.950.000 € |
|
Year |
: |
2010 |
|
Client |
MOTOR OIL HELLAS CORINTH REFINERIES S.A. |
Project |
: |
Pipeline routing replacement from the old to the new tunnel southeast of No 10 pump station |
|
Amount |
: |
75.000 € |
|
Year |
: |
2010 |
|
Client |
DRACOIL S.A. |
Project |
: |
Revamping & erection of new fuel loading station at Aspropyrgos fuel oil plant |
Amount |
: |
500.000 € |
Year |
: |
2005 |
Client |
HELLENIC FUELS S.A. |
Project |
: |
Replacement of bottom inside the annular plate & installation of relax pipe at ΤΚ2 tank at Heraklion Complex – Crete Island |
Amount |
: |
18.850 € |
Year |
: |
2012 |
Client |
HELLENIC FUELS S.A. |
Project |
: |
Replacement of shell rings at No 18 firefighting water tank at Heraklion Complex – Crete Island |
Amount |
: |
48.000 € |
Year |
: |
2011 |